On 6-7th December, large delegation from Wireless Montenegro visited our premises in Nivelles to proceed to the factory acceptance test (FAT) for radio system that will be deployed in the 14 tunnels of the A-1 Bar-Boljare motorway.
The technical teams have successfully tested and validated the system that will cover a total of 36 kms of tunnel with the radio coverage of the TETRA national security network and FM channels with break-in to insert emergency messages.
Next steps are installation and commissioning that will be done early 2023.